← All Tools
PRO
Bean/Choke Performance
Paste choke test data to plot performance curves and detect erosion or plugging trends.
Choke Test Data
Paste: Choke Size (64ths inch), Flow Rate (STB/d), WHP (psi)
Performance Curve
Max Rate
--
Critical Flow Status
--
C Coefficient
--
Analysis
How this works
Gilbert correlation: q = C × (WHP)^a × D^b, where D = choke diameter. The performance curve plots rate vs choke size at measured WHPs.
Critical flow: When flow rate stops increasing with larger choke, the well is in critical (sonic) flow through the choke. Below critical, the choke controls the rate.
Need help with production optimization or choke management?
Book a free strategy call →