← All Tools
PRO

Bean/Choke Performance

Paste choke test data to plot performance curves and detect erosion or plugging trends.

Choke Test Data

Paste: Choke Size (64ths inch), Flow Rate (STB/d), WHP (psi)

Performance Curve

Max Rate

--

Critical Flow Status

--

C Coefficient

--

Analysis

How this works

Gilbert correlation: q = C × (WHP)^a × D^b, where D = choke diameter. The performance curve plots rate vs choke size at measured WHPs.

Critical flow: When flow rate stops increasing with larger choke, the well is in critical (sonic) flow through the choke. Below critical, the choke controls the rate.

Need help with production optimization or choke management?

Book a free strategy call →

Disclaimer: For screening and educational purposes only.