Frac Stage Optimizer
Compare up to 3 completion scenarios side by side. Optimize stage count, cluster spacing, proppant loading, and cost.
Well Parameters
Scenario A
Scenario B
Scenario C
Cost Comparison
How this works
Stages: Total stages = Lateral Length / Stage Length (rounded down).
Cluster Spacing: Stage Length / Clusters per Stage.
Total Proppant: Proppant per Stage x Number of Stages.
Total Cost: Sum of proppant cost + pump cost + perf/plug cost across all stages.
Proppant Intensity: Total proppant (lbs) / Lateral Length (ft) - a key metric for completion efficiency.
Need help optimizing your completion design for maximum EUR per dollar spent?
Book a free strategy call →