← All Tools
PRO
RTA - Square Root Time
Square root time analysis for linear flow identification. Estimate sqrt(k)*xf and OOIP/OGIP from flowing material balance.
Production & Pressure Data
Tab-separated: time (days), rate (bbl/d or Mcf/d), Pwf (psi). Sample data pre-loaded.
Need advanced RTA, pressure transient analysis, or reservoir simulation? We build AI-powered solutions.
Book a free strategy call →