Sand Production Predictor
PROPredict sanding onset from drawdown pressure vs rock strength. Calculate critical drawdown and safe operating envelope.
Rock & Reservoir Properties
Current Drawdown
--
Critical Drawdown
--
TWC Strength (est.)
--
Sanding Risk
--
Recommendations
How this was calculated
Drawdown: DP = Pres - BHP.
TWC estimate: TWC ~ 0.4 x UCS (empirical correlation).
Effective stress at wellbore: Uses simplified Mohr-Coulomb with Biot effective stress and overburden loading.
Critical drawdown: DP_crit = UCS / (2 x (1 - Poisson) / (1 + Poisson)) - simplified for open-hole. Accounts for stress concentration at wellbore wall.
Risk: LOW if DP < 0.5 x DP_crit, MEDIUM if DP < 0.8 x DP_crit, HIGH if DP >= 0.8 x DP_crit.
Need detailed geomechanical analysis, sand management plans, or completion optimization?
Book a free strategy call →