← All Tools

Sand Production Predictor

PRO

Predict sanding onset from drawdown pressure vs rock strength. Calculate critical drawdown and safe operating envelope.

Rock & Reservoir Properties

Current Drawdown

--

Critical Drawdown

--

TWC Strength (est.)

--

Sanding Risk

--

Recommendations

How this was calculated

Drawdown: DP = Pres - BHP.

TWC estimate: TWC ~ 0.4 x UCS (empirical correlation).

Effective stress at wellbore: Uses simplified Mohr-Coulomb with Biot effective stress and overburden loading.

Critical drawdown: DP_crit = UCS / (2 x (1 - Poisson) / (1 + Poisson)) - simplified for open-hole. Accounts for stress concentration at wellbore wall.

Risk: LOW if DP < 0.5 x DP_crit, MEDIUM if DP < 0.8 x DP_crit, HIGH if DP >= 0.8 x DP_crit.

Need detailed geomechanical analysis, sand management plans, or completion optimization?

Book a free strategy call →

Disclaimer: Simplified model for screening. Validate with lab core tests, logs, and full geomechanical modeling.