← All Tools
PRO
Wax Deposition & Pour Point
Estimate WAT, pour point, deposition rate, and pigging frequency from crude oil properties.
Crude Oil & Pipeline Properties
WAT (est.)
--
F
Pour Point (est.)
--
F
Wax Risk
--
Deposition Rate
--
in/month
Pigging Interval
--
days
Max Wax Thickness
--
in (before pigging)
Engineering formulas
WAT estimation: WAT ~ 30 + 2.5 * WaxContent(%) + 0.3 * (50 - API) [simplified correlation]
Pour point: PP ~ WAT - 20F (typical offset)
Deposition rate: Based on (WAT - Tamb) driving force, wax content, and flow regime. Simplified: rate ~ 0.01 * Wax% * (WAT - Tamb) / 100 in/month
Pigging interval: Pig when wax thickness reaches ~5% of pipe ID. Interval = (0.05 * ID) / deposition_rate * 30 days
Need flow assurance studies, wax management, or pipeline design?
Book a free strategy call →